US 29 over DOUBLE CREEK

2.3 MI.N.OF PIKE CO LINE · County 011, Alabama · Built 1969 · 2 Lanes · 710 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
010001
Year Built
1969
Length
72.5 m (237.9 ft)
Max Span
10.4 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
710
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,668,000
Total Project Cost
$2,935,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.