COLEY CREEK RD over CENTRAL OF GA RR

0.9 MI N US 280 · County 123, Alabama · Built 1969 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
009972
Year Built
1969
Length
29 m (95.1 ft)
Max Span
19.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$836,000
Total Project Cost
$920,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.