IN 85 over RYAN ST

2.7 MI.N.OF I65 · County 101, Alabama · Built 1969 · 8 Lanes · 109,830 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
009926
Year Built
1969
Reconstructed
1994
Length
41.1 m (134.8 ft)
Max Span
15.5 m
Width
41.8 m (137.1 ft)
Lanes
8
Daily Traffic
109,830
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,764,000
Total Project Cost
$5,240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.