I - 65 SOUTH over AL - 5 (US 78)
I 65 * 8 TH AVE NO · County 073, Alabama · Built 1969 · 4 Lanes · 66,525 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
33.496864, -86.815667
This bridge is in worse condition than 77.2% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 57 years old.
Nearby Bridges
I - 65 NORTH over AL - 5 (US 78)
Built 1969
RAMP AL 149 TOI65 over 8 TH ST SO
Built 1970
I - 65 over AL - 149
Built 1970
I - 65 over 8TH STREET SOUTH
Built 1970
I - 65 over 6TH AVE. SOUTH
Built 1970
I - 65 over 5TH. AVE NORTH
Built 1969
I - 65 over 5TH AVE. SOUTH
Built 1970
I - 65 over 4TH AVE SO
Built 1970
I65 M.P.258.17 over 16TH AVE. SOUTH
Built 1970
RAMP TO I65 SBL over 2 ND AVE NO
Built 1969
Bridge Details
- Structure #
- 009907
- Year Built
- 1969
- Reconstructed
- 2003
- Length
- 54.9 m (180.1 ft)
- Max Span
- 25.3 m
- Width
- 23.5 m (77.1 ft)
- Lanes
- 4
- Daily Traffic
- 66,525
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,443,000
- Total Project Cost
- $3,787,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.