SR 53 over BROGLAN BRANCH

1.3 MI N JCT US 72 · County 089, Alabama · Built 1957 · 5 Lanes · 28,908 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
009845
Year Built
1957
Reconstructed
1969
Length
15.8 m (51.8 ft)
Max Span
3.7 m
Lanes
5
Daily Traffic
28,908
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$940,000
Total Project Cost
$1,034,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.