SR 113 over CSX RR * RINGOLD ST

0.1 MI N AL/FL LINE · County 053, Alabama · Built 1968 · 4 Lanes · 12,786 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
009782
Year Built
1968
Length
160.3 m (525.9 ft)
Max Span
23.8 m
Width
22 m (72.2 ft)
Lanes
4
Daily Traffic
12,786
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,286,000
Total Project Cost
$9,115,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.