AL-86 over Stream

0.2 MI W JCT US 82 · County 107, Alabama · Built 1968 · 2 Lanes · 2,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
009767
Year Built
1968
Length
6.4 m (21 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$429,000
Total Project Cost
$472,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.