AL - 3 (US 31) over 29 TH AVE NO

US 31 * 29 TH AVE NO · County 073, Alabama · Built 1968 · 4 Lanes · 11,590 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
009602
Year Built
1968
Length
351.1 m (1151.9 ft)
Max Span
24.4 m
Width
18.5 m (60.7 ft)
Lanes
4
Daily Traffic
11,590
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,444,000
Total Project Cost
$15,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.