CO. RT. 01 over CANE CREEK

3.68 MI.N CHANCE P.O. · County 025, Alabama · Built 1968 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
009583
Year Built
1968
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,233,000
Total Project Cost
$1,356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.