WIRE MILL ROAD over I - 20/59

@ TCI WIRE MILL · County 073, Alabama · Built 1968 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
009514
Year Built
1968
Length
99.4 m (326.1 ft)
Max Span
25.9 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,236,000
Total Project Cost
$2,460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.