CR-20 over I-20/59

CR-20 MP 32.8 · County 063, Alabama · Built 1968 · 2 Lanes · 1,333 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
009513
Year Built
1968
Length
86.6 m (284.1 ft)
Max Span
23.8 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
1,333
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,917,000
Total Project Cost
$2,109,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.