CO 134 over POLE BRIDGE BRANCH

1.2 MI E OF 89 ON ST LINE · County 077, Alabama · Built 1967 · 2 Lanes · 140 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
009442
Year Built
1967
Length
10.1 m (33.1 ft)
Max Span
10.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
140
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$277,000
Total Project Cost
$305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.