36TH ST. ENS. over FRISCO * SOU RR
36TH ST ENS * RR · County 073, Alabama · Built 1967 · 4 Lanes · 14,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.500975, -86.912
This bridge is in worse condition than 35.5% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 59 years old.
Nearby Bridges
I - 20/59 over LLOYD NOLAN PKWY
Built 1968
I - 20/59 over 41ST ST ENSLEY
Built 1968
TERRACE G over OPOSSUM CREEK
Built 1935
I - 20/59 over AVE I
Built 1966
I - 20/59 over BRANCH
Built 1966
I - 20/59 over CRAWFORD STREET
Built 1968
AL 269 M.P.1.43 over T C I STEEL MILL
Built 1954
I 59/20 SOUTH over VALLEY ROAD
Built 1968
10 TH AVE WYLAM over UNITED STATES STEEL RR
Built 1952
I 59/20 over VALLEY ROAD
Built 1968
Bridge Details
- Structure #
- 009349
- Year Built
- 1967
- Length
- 150.3 m (493.1 ft)
- Max Span
- 21.3 m
- Width
- 19.5 m (64 ft)
- Lanes
- 4
- Daily Traffic
- 14,000
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,935,000
- Total Project Cost
- $7,629,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.