I65 NBL / SBL over EDGEMONT AVE

1.2 MI.N.OF S.BYPASS · County 101, Alabama · Built 1967 · 6 Lanes · 33,725 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
009281
Year Built
1967
Length
62 m (203.4 ft)
Max Span
24.4 m
Width
33.8 m (110.9 ft)
Lanes
6
Daily Traffic
33,725
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,463,000
Total Project Cost
$6,009,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.