CO RD 25 over I65

1.65 MI.N.OF AL.106 · County 013, Alabama · Built 1967 · 2 Lanes · 723 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

31.677739, -86.755822

This bridge is in worse condition than 55.6% of bridges in County 013. The average bridge in Alabama is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
009249
Year Built
1967
Length
80.7 m (264.8 ft)
Max Span
22.3 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
723
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,743,000
Total Project Cost
$1,917,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.