CO 103-SILVER RUN over I-20

2.0 MI E EXIT 179 · County 121, Alabama · Built 1967 · 2 Lanes · 1,623 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
009234
Year Built
1967
Length
75.3 m (247 ft)
Max Span
20.7 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,623
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,524,000
Total Project Cost
$1,676,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.