AL-7 over I-20/59

AL-7 MP 52.3 · County 063, Alabama · Built 1966 · 2 Lanes · 2,088 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 7 Good

Location

32.986142, -87.789156

This bridge is in worse condition than 84.3% of bridges in County 063. The average bridge in Alabama is 0 years old; this one is 60 years old.

Nearby Bridges

Bridge Details

Structure #
009057
Year Built
1966
Length
94.3 m (309.4 ft)
Max Span
25.9 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,088
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,350,000
Total Project Cost
$2,585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.