CO 06 over SEABOARD RR

2 MI N COTTONTON · County 113, Alabama · Built 1966 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
009053
Year Built
1966
Length
64.6 m (211.9 ft)
Max Span
24.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,697,000
Total Project Cost
$1,867,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.