I65 over CANEY CREEK

0.3 MI.N.OF US 31 · County 101, Alabama · Built 1966 · 5 Lanes · 49,500 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
009001
Year Built
1966
Length
39.9 m (130.9 ft)
Max Span
4.3 m
Lanes
5
Daily Traffic
49,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,966,000
Total Project Cost
$5,463,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.