I-65 SB TO I-10 EB over I-10 WB

I-10 @ I-65 INTERCHANGE · County 097, Alabama · Built 1966 · 2 Lanes · 24,294 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
008998
Year Built
1966
Length
146.6 m (481 ft)
Max Span
38.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
24,294
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,494,000
Total Project Cost
$3,843,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.