CO 326 over CHOCCOLOCCO CREEK
8.0 MI N TALLADEGA · County 121, Alabama · Built 1965 · 2 Lanes · 915 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.548447, -86.09675
This bridge is in worse condition than 52.7% of bridges in County 121. The average bridge in Alabama is 0 years old; this one is 61 years old.
Nearby Bridges
SR 77 over CHOCCOLOCCO CREEK
Built 1939
SR 77 over CHOCCOLOCCO CREEK
Built 1975
SR 77 over BRANCH
Built 1939
PINE HILL ROAD over SMALL PERIODIC STREAM
Built 1980
I-20 over BRANCH
Built 1965
CO79/DRY VALLEY RD over I-20
Built 1964
I-20 over BRANCH
Built 1965
EASTABOGA ROAD over CHOCCOLOCCO CREEK
Built 1946
EASTABOGA ROAD over CHEAHA CREEK
Built 2004
SR-77 over I-20
Built 1964
Bridge Details
- Structure #
- 008925
- Year Built
- 1965
- Length
- 151.8 m (498 ft)
- Max Span
- 79.5 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 915
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,062,000
- Total Project Cost
- $3,368,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.