COUNTY ROAD 21 over ELLIOTS CREEK

3.0 MI. S. OF MOUNDVILLE · County 065, Alabama · Built 1965 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
008740
Year Built
1965
Length
46.3 m (151.9 ft)
Max Span
5.8 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$888,000
Total Project Cost
$977,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.