US 82 over BRANCH

3.5 MI W OF MERIWETHER RD · County 101, Alabama · Built 1965 · 4 Lanes · 16,370 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
008673
Year Built
1965
Length
7.6 m (24.9 ft)
Max Span
3 m
Lanes
4
Daily Traffic
16,370
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,008,000
Total Project Cost
$1,109,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.