I-10 WB over STYX RIVER

3.3 MI E CO RD 87 · County 003, Alabama · Built 1965 · 2 Lanes · 18,681 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
008530
Year Built
1965
Length
258.2 m (847.1 ft)
Max Span
24.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
18,681
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,842,000
Total Project Cost
$6,426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.