SR 2 over POPLAR CREEK

9.8 M W JCT SR 2 & SR 3 · County 083, Alabama · Built 1924 · 5 Lanes · 10,450 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
008497
Year Built
1924
Reconstructed
1965
Length
10.4 m (34.1 ft)
Max Span
4.9 m
Width
22.6 m (74.1 ft)
Lanes
5
Daily Traffic
10,450
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$866,000
Total Project Cost
$953,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.