ST CLAIR CO 26 over SHOAL CREEK

3 7 MI NE FAIRVIEW CHURCH · County 115, Alabama · Built 1964 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
008310
Year Built
1964
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
600
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,021,000
Total Project Cost
$1,123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.