CO.RD.9 over IVY CREEK

PEACE RD. · County 001, Alabama · Built 1964 · 2 Lanes · 192 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
008262
Year Built
1964
Length
42.1 m (138.1 ft)
Max Span
14 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
192
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$817,000
Total Project Cost
$899,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.