AL9 SBL over I85 SBL

E.BYPASS AND I85 INTERCHE · County 101, Alabama · Built 1964 · 3 Lanes · 28,770 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
008259
Year Built
1964
Length
58.5 m (191.9 ft)
Max Span
22.3 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
28,770
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,550,000
Total Project Cost
$2,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.