I-65 SB over BRANCH

2.3 MI N BALDWIN CO LINE · County 053, Alabama · Built 1964 · 2 Lanes · 13,369 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
008174
Year Built
1964
Length
8.5 m (27.9 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
13,369
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,070,000
Total Project Cost
$1,177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.