RIVERE DU CHIEN RD over I-10

3.3 MI E US 90 · County 097, Alabama · Built 1964 · 6 Lanes · 976 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
008139
Year Built
1964
Length
75.3 m (247 ft)
Max Span
20.7 m
Width
8.8 m (28.9 ft)
Lanes
6
Daily Traffic
976
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,700,000
Total Project Cost
$1,870,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.