I-85 over BRANCH

1.28 MI. N. AL.49 · County 087, Alabama · Built 1963 · 4 Lanes · 31,250 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
007863
Year Built
1963
Length
7.9 m (25.9 ft)
Max Span
3 m
Lanes
4
Daily Traffic
31,250
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,667,000
Total Project Cost
$1,834,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.