PINE STREET over CIRCULAR ROAD

1.5 MI N JCT SR 20 · County 077, Alabama · Built 1962 · 4 Lanes · 18,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
007762
Year Built
1962
Length
92.7 m (304.1 ft)
Max Span
19.5 m
Width
18.3 m (60 ft)
Lanes
4
Daily Traffic
18,500
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,208,000
Total Project Cost
$4,629,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.