COUNTY ROAD 20 over PAULS CREEK

4.2 MI E OF AL 51 · County 005, Alabama · Built 1962 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
007679
Year Built
1962
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$979,000
Total Project Cost
$1,077,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.