AL - 5 NORTH over L * N RR(ABANDONED)

EAST OF SAYRE · County 073, Alabama · Built 1962 · 2 Lanes · 9,305 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
007628
Year Built
1962
Length
38.4 m (126 ft)
Max Span
12.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
9,305
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$983,000
Total Project Cost
$1,081,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.