CAMPBELL GAP ROAD over I 59

1 MI NO STEPHENS GAP ROAD · County 055, Alabama · Built 1962 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
007553
Year Built
1962
Length
93.9 m (308.1 ft)
Max Span
25.9 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
100
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,057,000
Total Project Cost
$2,263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.