ROADWAY over CO RT 1182 NOXUBEE RIVER

1.0 MI N AL HWY 116 · County 119, Alabama · Built 1961 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
007495
Year Built
1961
Length
96.9 m (317.9 ft)
Max Span
24.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,896,000
Total Project Cost
$2,086,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.