AL-86 over Lubbub Creek

1.2 MI E Carrollton · County 107, Alabama · Built 1961 · 2 Lanes · 3,058 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
007459
Year Built
1961
Length
124.7 m (409.1 ft)
Max Span
10.4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
3,058
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,646,000
Total Project Cost
$2,911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.