CR # 85 over DRY CEDAR CREEK

3.1 MI S CR 12 · County 047, Alabama · Built 1963 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
007457
Year Built
1963
Length
235.7 m (773.3 ft)
Max Span
18.3 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
400
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,717,000
Total Project Cost
$4,089,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.