US 411 over COOSA RIVER

.2 MI. N. OF 68 * AL 25 · County 019, Alabama · Built 1961 · 4 Lanes · 16,699 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
007379
Year Built
1961
Length
271.9 m (892.1 ft)
Max Span
54.9 m
Width
18 m (59.1 ft)
Lanes
4
Daily Traffic
16,699
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000,000
Total Project Cost
$12,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.