7TH AVE SW over AL - 5 (US 78)

AL - 5 / 7TH AVE SW · County 073, Alabama · Built 1961 · 2 Lanes · 2,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
007328
Year Built
1961
Length
74.7 m (245.1 ft)
Max Span
20.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
2,250
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,397,000
Total Project Cost
$1,537,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.