I - 20 over NORFOLK SOUTHERN

.1 MI W. RIVERSIDE EXIT · County 115, Alabama · Built 1961 · 8 Lanes · 43,320 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
007221
Year Built
1961
Reconstructed
1993
Length
58.8 m (192.9 ft)
Max Span
22.3 m
Width
45.1 m (148 ft)
Lanes
8
Daily Traffic
43,320
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,024,000
Total Project Cost
$7,726,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.