SR 113 over I-65

SR 113 @ I65 · County 053, Alabama · Built 1960 · 2 Lanes · 5,704 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
007122
Year Built
1960
Length
104.9 m (344.2 ft)
Max Span
29.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
5,704
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,580,000
Total Project Cost
$2,838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.