AL-74 over Sipsey River

7 MI E JCT AL-33 · County 133, Alabama · Built 1960 · 2 Lanes · 3,197 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
007095
Year Built
1960
Length
141.7 m (464.9 ft)
Max Span
30.5 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
3,197
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,386,000
Total Project Cost
$3,725,000