SAULTER RD over GRIFFIN BROOK

INT SAULTER * BROADWAY · County 073, Alabama · Built 1960 · 2 Lanes · 5,055 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
007079
Year Built
1960
Length
11.6 m (38.1 ft)
Max Span
11.6 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
5,055
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$339,000
Total Project Cost
$373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.