CR-55 over Finikochika Creek

2.2 MI NE UNITY · County 037, Alabama · Built 1960 · 2 Lanes · 287 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

33.043472, -86.336506

This bridge is in worse condition than 57.9% of bridges in County 037. The average bridge in Alabama is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
007058
Year Built
1960
Reconstructed
1993
Length
10.4 m (34.1 ft)
Max Span
5.2 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
287
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$293,000
Total Project Cost
$322,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.