STINNETT HOLLOW RD over MCGOWAN BRANCH

SEC9 T2S R6W · County 083, Alabama · Built 1960 · 2 Lanes · 608 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
007054
Year Built
1960
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
608
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$250,000
Total Project Cost
$275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.