US 11; SR 7 over I-59

US11 OVP MP 224.7 · County 049, Alabama · Built 1960 · 2 Lanes · 7,166 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
006935
Year Built
1960
Length
116.7 m (382.9 ft)
Max Span
32 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
7,166
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,837,000
Total Project Cost
$3,121,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.