SR 2 over BRANCH

2.1 MI E JCT SR 2 & SR13 · County 077, Alabama · Built 1960 · 4 Lanes · 23,230 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
006910
Year Built
1960
Length
9.4 m (30.8 ft)
Max Span
3 m
Lanes
4
Daily Traffic
23,230
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,941,000
Total Project Cost
$2,135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.