US 431 over BRANCH

3 . 3 MI NO ETOWAH CO LN · County 055, Alabama · Built 1960 · 5 Lanes · 20,045 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
006898
Year Built
1960
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
5
Daily Traffic
20,045
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,074,000
Total Project Cost
$1,181,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.