RIPLEY ROAD over SIMS BRANCH

2 MILES N HWY 78 · County 127, Alabama · Built 1960 · 1 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006884
Year Built
1960
Length
6.4 m (21 ft)
Max Span
6.4 m
Width
6.1 m (20 ft)
Lanes
1
Daily Traffic
1,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$173,000
Total Project Cost
$190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.